View clinical trials related to Critical Pathways.
Filter by:The main objective of this study is to analyze the impact on five years survival of an enhanced recovery program (PRI) after radical surgery for colorectal cancer. As secondaries objectives, we propose to analyze comparing survival distributions between patient groups (ERAS/no ERAS) and the relationship between the ERAS program and early incorporation into oncology therapies (RIOT). It is proposed to review the medical records of oncology patients included in POWER 1 (as already foreseen in that study), with the aim of performing a 5-year follow-up. To create comparable treatment and control groups, the Propensity Index method will be used. To study each variable, multivariate regression will be used. Kaplan-Meier will be used for survival and the log-rank test for comparisons. Significance will be considered if p <0.05 (two tails).