Clinical Trials Logo

Clinical Trial Summary

Anal canal carcinoma (ACC) represents 1.2% of digestive cancers. Its incidence is increasing. As epidermoid ACC (95% of ACC) are particularly sensitive to radio and chemotherapy, concomitant radio-chemotherapy is the standard treatment of locally advanced ACC, with proven efficacy on locoregional control, anal sphincter preservation, progression-free survival and complete response rate higher than 80%. Nevertheless, conventional radiotherapy frequently induces significant non-haematological toxicities requiring treatment interruptions. Thus, treatment usually includes a chemotherapy (5-Fluorouracil and Mitomycine-C) and 25 fractions of 1.8 Gy followed by a planned 1-week (or more) interruption and a boost, for a total 54-60 Gy radiation dose over 9 weeks. Considering the numerous anatomic pelvic structures, ACC has become a localisation of interest for Intensity-Modulated Radiation Therapy (IMRT) associated with less toxicity. However, IMRT induces gradeā‰„3 cutaneous toxicities requiring irradiation breaks. Dose escalade did not show its interest: 60 Grays remains the standard. Assuming the deleterious effect of increased overall treatment time on local control and survival in head-and-neck and cervical cancers and the epidermoid histology of ACC, the benefit of no irradiation break on ACC tumour control is of interest. IMRT offers the possibility to deliver different doses to different target volumes simultaneously by altered fractionation schedule like SIB-IMRT (simultaneously integrated boost-IMRT). Several SIB-IMRT schedules have been retrospectively evaluated. Similar results were observed with moderate doses and schedules delivering higher doses with short interruptions. Nevertheless, standard SIB-IMRT schedule in ACC still not exist.


Clinical Trial Description

n/a


Study Design


Related Conditions & MeSH terms


NCT number NCT02701088
Study type Interventional
Source Centre Francois Baclesse
Contact
Status Active, not recruiting
Phase Phase 2
Start date December 2015
Completion date December 2023