Clinical Trials Logo

Clinical Trial Summary

Observational study of Internal Limiting Membrane peeled in macular Hole surgery and studied by Transmission electronic Microscopy (TEM) and Optical Coherence Tomography (OCT) findings in closed holes.


Clinical Trial Description

A non-randomized prospective study of eyes with MH willing to have surgery at the Department of Ophthalmology of Santa Maria Hospital, Lisbon.

Surgeries are performed under local or general anesthesia, pars plana vitrectomy with internal limiting membrane peeling, fluid gas exchange and face down position.

Two samples of discarded ILM peeled in Macular hole surgery is studied in Laboratory.

Laboratory Analysis Two samples of ILM per patient are harvested, one will be immediately fixed and submitted to Optic Microscopy (OM) and Transmission Electron Microscopy (TEM) analysis, and another sample will be incubated in enriched medium 199 (Gibco) for 20 minutes at room temperature, after which it will also be fixed and submitted to OM and TEM analysis. Both samples from same patient will follow the protocol available at dx.doi.org/10.17504/protocols.io.qjiduke.

Image acquisition Six electron-micrographs will be acquired for each fragment, using a Hitachi H-7000 electron microscope equipped with a megaview III digital camera. Fields of interest will be randomly selected, and acquisition of 15,000x magnification images.

Histology and immunohistochemistry ILM samples will be stained with anti-GFAP antibody (anti-glial fibrillary acidic protein), to detect this protein in glial cells.

Results:

Only successful macular hole closure will be considered, BCVA will be compared before and after surgery and related to OCT findings. ILM findings in TEM analysis will be compared with and without enriched medium. ;


Study Design


Related Conditions & MeSH terms


NCT number NCT03799575
Study type Observational
Source Hospital de Santa Maria, Portugal
Contact Nuno P Ferreira, MD
Phone +351918503467
Email ngcpferreira@gmail.com
Status Recruiting
Phase
Start date January 2, 2019
Completion date July 2, 2019